What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 32 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | EDF Energy F01C | £121.00 |
| 2 | Larks Green | £119.50 |
| 3 | SUNDON | £119.50 |
| Region | £/MWh |
|---|---|
| South Western | £119.5 |
| Eastern | £119.5 |