What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 32 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | UKPR MANW | £10.83 |
| 2 | UKPR East Mids | £10.78 |
| 3 | Seabank Module | £9.33 |
| 4 | Arbroath | £9.13 |
| 5 | GridBeyond L0DN | £8.94 |
| 6 | Byers Brae | £8.08 |
| 7 | Coupar | £7.73 |
| Region | £/MWh |
|---|---|
| South Scotland | £8.1 |
| North Scotland | £8.0 |