What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 15 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Jamesfield 2 | £52.00 |
| 2 | Didcot B main 5 | £18.65 |
| 3 | Seabank Module | £9.78 |
| 4 | EDFE Aggregate N Scot 1 | £9.45 |
| 5 | UKPR MANW | £8.88 |
| 6 | GridBeyond L0DN | £8.88 |
| 7 | UKPR S East | £8.63 |
| Region | £/MWh |
|---|---|
| North Scotland | £52.0 |
| Midlands | £5.4 |