What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 54 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Staythorpe 2 | £5.05 |
| 2 | SSE Energy Supply #01 | £4.22 |
| 3 | Pen y Cymoedd | £4.02 |
| 4 | GridBeyond L0DN | £3.86 |
| 5 | Shoreham | £3.70 |
| 6 | West Burton B 2 | £3.42 |
| 7 | Lakeside | £3.38 |
| Region | £/MWh |
|---|---|
| South Wales | £4.0 |
| Yorkshire | £3.4 |