What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 28 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Pillswood 1 | £12.30 |
| 2 | Pillswood 2 | £12.17 |
| 3 | Centrica Business Solutions S05L | £8.77 |
| 4 | Drax | £7.52 |
| 5 | Drax | £7.40 |
| Region | £/MWh |
|---|---|
| Yorkshire | £12.3 |