What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 45 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Unit 2 | £20.15 |
| 2 | GridBeyond L0DN | £15.80 |
| 3 | ClayTye Farm 1 | £14.38 |
| 4 | Roaring Hill | £14.38 |
| 5 | Tye Lane | £14.27 |
| 6 | West Burton B 1 | £14.25 |
| 7 | Blackpool | £13.71 |
| Region | £/MWh |
|---|---|
| Eastern | £14.0 |
| South Scotland | £14.0 |
| South Eastern | £13.7 |