What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 17 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Didcot B main 5 | £15.38 |
| 2 | Unit 1 | £14.49 |
| 3 | GridBeyond L0DN | £12.28 |
| 4 | SOUTH HUMBER BANK P/S | £11.13 |
| 5 | Exergy Solutions E00E | £10.52 |
| 6 | Cowley | £8.63 |
| 7 | BESS Holdco 2 N03J | £8.62 |
| Region | £/MWh |
|---|---|
| South Eastern | £6.0 |
| North Scotland | £5.9 |
| North Western | £3.9 |