What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 19 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Roaring Hill | £17.97 |
| 2 | GridBeyond L0DN | £17.65 |
| 3 | ClayTye Farm 1 | £16.89 |
| Region | £/MWh |
|---|---|
| South Scotland | £18.0 |
| Eastern | £16.9 |