What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 38 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Staythorpe 2 | £12.00 |
| 2 | Pembroke 41 | £10.06 |
| 3 | Staythorpe 4 | £10.00 |
| 4 | Bloxwich | £6.97 |
| 5 | Spalding | £6.19 |
| 6 | GridBeyond L08H | £5.81 |
| 7 | GridBeyond L02E | £5.80 |
| Region | £/MWh |
|---|---|
| Midlands | £7.0 |
| South Eastern | £5.4 |
| Eastern | £5.1 |
| South Wales | £4.0 |