What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 14 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | EDFE Aggregate N Scot 1 | £41.42 |
| 2 | EDFE Aggregate S Eng 02 | £39.43 |
| 3 | Cowley | £34.29 |
| 4 | BESS Holdco 2 N03J | £34.29 |
| 5 | Tye Lane | £34.26 |
| 6 | EDF Energy F01C | £32.79 |
| 7 | Pen y Cymoedd | £31.24 |
| Region | £/MWh |
|---|---|
| South Eastern | £34.3 |
| Eastern | £34.3 |
| South Wales | £31.2 |