What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 9 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | EDFE Aggregate N Scot 1 | £2.65 |
| 2 | EDFE Aggregate S Eng 02 | £2.31 |
| 3 | Hunningley Stairfoot | £1.89 |
| 4 | Carnegie Road 1 | £1.82 |
| Region | £/MWh |
|---|---|
| Yorkshire | £1.9 |
| Merseyside and North Wales | £1.8 |