What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 21 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Flexitricity #01 | £7.04 |
| 2 | GridBeyond L0DN | £6.94 |
| 3 | Flexitricity #02 | £6.89 |
| 4 | Flexitricity #01 | £6.75 |
| 5 | Lakeside | £6.38 |
| 6 | Flexitricity X02N | £6.24 |
| 7 | Drax | £6.18 |
| Region | £/MWh |
|---|---|
| Yorkshire | £6.4 |
| North Scotland | £5.8 |