What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 32 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Seabank Module 2 | £10.50 |
| 2 | GridBeyond L0DN | £5.76 |
| 3 | Tye Lane | £4.60 |
| 4 | Zenobe Capenhurst #4 | £4.35 |
| 5 | EDF Energy F01C | £4.00 |
| 6 | BESS Holdco 2 N03J | £3.42 |
| 7 | BESS Holdco 2 N02A | £3.33 |
| Region | £/MWh |
|---|---|
| Eastern | £4.6 |
| Merseyside and North Wales | £4.4 |