What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 24 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | EDFE Aggregate N Scot 1 | £5.47 |
| 2 | Port of Tyne | £4.55 |
| 3 | Arbroath | £4.27 |
| 4 | Tye Lane | £2.52 |
| 5 | Statkraft Markets #09 | £0.71 |
| Region | £/MWh |
|---|---|
| Northern | £4.5 |
| North Scotland | £4.3 |
| Eastern | £2.5 |