What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 15 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Didcot B main 5 | £9.33 |
| 2 | Jamesfield 1 | £8.48 |
| 3 | F & S Energy #02 | £7.29 |
| 4 | Native River | £7.19 |
| 5 | Port of Tyne | £7.00 |
| 6 | Hunningley Stairfoot | £7.00 |
| Region | £/MWh |
|---|---|
| North Scotland | £8.5 |
| South Western | £7.2 |
| Northern | £7.0 |
| Yorkshire | £7.0 |