What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 30 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Thame Road | £7.36 |
| 2 | Pen y Cymoedd | £6.48 |
| 3 | Jamesfield 1 | £6.25 |
| 4 | Unit 2 | £6.00 |
| Region | £/MWh |
|---|---|
| Eastern | £7.4 |
| South Wales | £6.5 |
| North Scotland | £6.3 |