What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 19 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Didcot B main 5 | £16.04 |
| 2 | Peterhead Block 1 | £11.00 |
| 3 | Unit 1 | £10.31 |
| 4 | Lakeside | £9.26 |
| 5 | EDFE Aggregate N Scot 1 | £7.26 |
| 6 | Pen y Cymoedd | £7.00 |
| 7 | Swangate | £6.50 |
| Region | £/MWh |
|---|---|
| Yorkshire | £9.1 |
| South Wales | £7.0 |
| North Western | £5.8 |
| North Scotland | £4.0 |