What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 8 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Didcot B main 5 | £16.50 |
| 2 | Unit 1 | £10.55 |
| 3 | EDFE Aggregate N Scot 1 | £7.39 |
| 4 | Pen y Cymoedd | £7.33 |
| 5 | Spalding | £6.50 |
| 6 | Swangate | £5.67 |
| 7 | Arbroath | £4.55 |
| Region | £/MWh |
|---|---|
| South Wales | £7.3 |
| Yorkshire | £5.7 |
| North Scotland | £4.6 |
| Northern | £4.3 |
| South Western | £3.3 |