What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 12 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Didcot B main 5 | £16.00 |
| 2 | Statkraft Markets #4 | £14.72 |
| 3 | Seabank Module 2 | £11.50 |
| 4 | Unit 2 | £10.39 |
| 5 | Spalding | £9.94 |
| 6 | Great Yarmouth | £8.63 |
| 7 | Brigg | £7.83 |
| Region | £/MWh |
|---|---|
| North Western | £6.7 |
| South Wales | £6.5 |
| Yorkshire | £6.5 |
| Midlands | £5.9 |
| South Eastern | £4.0 |