What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 12 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Staythorpe 1 | £14.00 |
| 2 | Staythorpe 2 | £14.00 |
| 3 | Holes Bay | £12.50 |
| 4 | Enfield Centre Ltd BMU1 | £11.79 |
| 5 | Pembroke 11 | £7.75 |
| Region | £/MWh |
|---|---|
| Southern | £12.5 |