What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 20 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Marchwood | £13.50 |
| 2 | Grain | £9.15 |
| 3 | Peterhead Block 1 | £9.00 |
| 4 | Enfield Centre Ltd BMU1 | £8.75 |
| 5 | Unit 2 | £7.85 |
| 6 | EDFE Aggregate N Scot 1 | £6.80 |
| 7 | F & S Energy #02 | £6.66 |
| Region | £/MWh |
|---|---|
| South Western | £6.6 |
| North Scotland | £4.4 |
| South Wales | £4.4 |
| Merseyside and North Wales | £4.0 |
| Yorkshire | £3.6 |
| North Western | £3.3 |
| South Scotland | £2.9 |