What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 21 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | EDFE Aggregate N Scot 1 | £6.10 |
| 2 | F & S Energy #02 | £5.75 |
| 3 | Brigg | £1.71 |
| 4 | Swangate | £1.00 |
| Region | £/MWh |
|---|---|
| Yorkshire | £1.7 |