What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 38 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Native River | £13.10 |
| 2 | Thame Road | £10.42 |
| 3 | EDFE Aggregate S Eng 02 | £9.31 |
| Region | £/MWh |
|---|---|
| South Western | £13.1 |
| Eastern | £10.4 |