What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 24 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Carnegie Road 1 | £5.80 |
| 2 | Ilmer Lane | £5.72 |
| 3 | Port of Tyne | £5.43 |
| 4 | F & S Energy #02 | £5.13 |
| 5 | Native River | £4.72 |
| Region | £/MWh |
|---|---|
| Merseyside and North Wales | £5.8 |
| Eastern | £5.7 |
| Northern | £5.4 |
| South Western | £4.7 |