What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 8 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | ECOTRICITY C05L | £26.71 |
| 2 | Tye Lane | £15.52 |
| 3 | SOUTH HUMBER BANK P/S | £6.38 |
| 4 | Spalding | £4.62 |
| Region | £/MWh |
|---|---|
| Eastern | £8.3 |