What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 31 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Little Barford main 1 | £9.69 |
| 2 | Jamesfield 2 | £6.71 |
| 3 | Seabank Module 2 | £5.87 |
| 4 | Unit 1 | £5.02 |
| 5 | Dong Severn Ut 20 | £3.94 |
| 6 | Peterhead Block 1 | £3.75 |
| 7 | Pen y Cymoedd | £2.92 |
| Region | £/MWh |
|---|---|
| North Scotland | £6.7 |
| South Wales | £2.9 |