What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 21 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Immingham CHP | £2.95 |
| 2 | Hunningley Stairfoot | £2.00 |
| 3 | Arbroath | £1.74 |
| 4 | Carrington Ltd - 1 | £1.62 |
| 5 | Pen y Cymoedd | £1.50 |
| 6 | Unit 1 | £1.50 |
| 7 | Sloy G1 | £1.48 |
| Region | £/MWh |
|---|---|
| Yorkshire | £2.0 |
| North Scotland | £1.7 |
| South Wales | £1.5 |
| South Western | £1.0 |