What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 40 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | EDFE Aggregate N Scot 1 | £31.59 |
| 2 | Cottam Development Centre | £26.00 |
| 3 | Tye Lane | £22.40 |
| 4 | Larks Green | £21.11 |
| 5 | SSE Energy Supply #01 | £20.12 |
| 6 | SUNDON | £19.29 |
| 7 | Glendoe 1 | £19.15 |
| Region | £/MWh |
|---|---|
| Eastern | £21.3 |
| South Western | £21.1 |