What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 23 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | EDFE Aggregate N Scot 1 | £26.05 |
| 2 | ECOTRICITY C05L | £24.30 |
| 3 | Tye Lane | £20.58 |
| 4 | Larks Green | £19.80 |
| 5 | Glendoe 1 | £19.80 |
| 6 | Limejump Energy #05 | £17.76 |
| Region | £/MWh |
|---|---|
| Eastern | £20.6 |
| South Western | £19.8 |