What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 1 accepted unit with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Centrica Business Solutions S05L | £2.19 |
| 2 | Cottam Development Centre | £1.55 |
| 3 | West Burton B 1 | £0.99 |
| 4 | Enfield Centre Ltd BMU1 | £0.90 |
| 5 | Limejump Energy #04 | £0.74 |
| 6 | Brigg | £0.56 |
| 7 | Swangate | £0.12 |
| Region | £/MWh |
|---|---|
| Yorkshire | £0.2 |