What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 41 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Unit 1 | £88.44 |
| 2 | SOUTH HUMBER BANK P/S | £86.84 |
| 3 | Shoreham | £82.17 |
| 4 | Brigg | £76.61 |
| 5 | Carnegie Road 1 | £72.75 |
| 6 | Ffestiniog | £66.08 |
| 7 | Peterborough 3 | £65.92 |
| Region | £/MWh |
|---|---|
| Merseyside and North Wales | £72.8 |
| South Wales | £60.3 |
| Yorkshire | £58.6 |
| Northern | £53.0 |
| South Western | £51.8 |