What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 27 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Keadby-2 Main | £18.81 |
| 2 | Wishaw | £11.85 |
| 3 | Brigg | £11.85 |
| 4 | Cottam Development Centre | £9.88 |
| 5 | Glendoe 1 | £9.87 |
| Region | £/MWh |
|---|---|
| South Scotland | £11.9 |
| Yorkshire | £11.8 |