What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 18 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Little Raith | £14.66 |
| 2 | Holes Bay | £13.88 |
| 3 | Roaring Hill | £11.90 |
| 4 | EDFE Aggregate N Scot 1 | £11.28 |
| 5 | Hawthorn Pit | £9.60 |
| 6 | Limejump Energy #04 | £9.32 |
| Region | £/MWh |
|---|---|
| South Scotland | £14.0 |
| Southern | £13.9 |
| Northern | £9.6 |