What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 16 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | ECOTRICITY C05L | £43.86 |
| 2 | Carrington Ltd - 1 | £43.55 |
| 3 | SOUTH HUMBER BANK P/S | £39.87 |
| 4 | Wishaw | £38.64 |
| 5 | Dong Severn Ut 20 | £38.36 |
| 6 | Peterborough 3 | £38.03 |
| 7 | Brigg DG-2 | £38.03 |
| Region | £/MWh |
|---|---|
| South Scotland | £30.3 |
| Eastern | £30.0 |
| South Eastern | £29.8 |
| North Scotland | £28.3 |