What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 25 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Carrington Ltd - 1 | £21.07 |
| 2 | SOUTH HUMBER BANK P/S | £19.34 |
| 3 | Unit 3 | £17.85 |
| 4 | Carnegie Road 1 | £16.43 |
| 5 | Coryton | £15.88 |
| 6 | Pillswood 2 | £14.88 |
| 7 | Centrica Business Solutions S06B | £14.64 |
| Region | £/MWh |
|---|---|
| Merseyside and North Wales | £16.4 |
| South Eastern | £14.6 |
| Yorkshire | £14.6 |
| South Wales | £14.4 |
| Northern | £14.3 |