What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 20 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Coupar | £2.91 |
| 2 | Pillswood 2 | £2.84 |
| 3 | Wormald Green | £2.71 |
| 4 | Unit 1 | £2.67 |
| Region | £/MWh |
|---|---|
| North Scotland | £2.9 |
| Yorkshire | £2.8 |
| Northern | £2.7 |