What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 10 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Native River | £7.76 |
| 2 | Centrica Business Solutions S05L | £7.06 |
| 3 | West Burton B 3 | £7.03 |
| 4 | Pillswood 2 | £6.67 |
| 5 | Wormald Green | £6.40 |
| 6 | Keadby-2 Main | £6.32 |
| 7 | Buxton | £6.11 |
| Region | £/MWh |
|---|---|
| South Western | £7.8 |
| Northern | £6.4 |
| North Western | £6.1 |
| Yorkshire | £6.1 |
| South Eastern | £5.0 |