What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 19 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Carnegie Road 1 | £10.22 |
| 2 | Immingham CHP | £10.13 |
| 3 | Marchwood | £8.26 |
| 4 | Peterhead Block 1 | £8.11 |
| 5 | Tye Lane | £7.44 |
| 6 | Statkraft Markets #08 | £6.75 |
| 7 | Thame Road | £5.45 |
| Region | £/MWh |
|---|---|
| Merseyside and North Wales | £10.2 |
| Eastern | £7.4 |
| North Scotland | £5.0 |
| Midlands | £3.1 |