What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 10 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Peterhead Block 1 | £16.16 |
| 2 | Marchwood | £14.44 |
| 3 | ClayTye Farm 1 | £9.15 |
| 4 | Skelmersdale | £8.43 |
| Region | £/MWh |
|---|---|
| Eastern | £9.1 |
| North Western | £8.4 |