What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 48 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Dollymans | £4.49 |
| 2 | Marchwood | £3.85 |
| 3 | EDFE Aggregate N Scot 1 | £3.82 |
| 4 | Immingham CHP | £3.58 |
| 5 | Spalding | £3.48 |
| 6 | Broadditch | £3.25 |
| Region | £/MWh |
|---|---|
| Eastern | £4.5 |
| South Eastern | £3.2 |