What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 19 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Immingham CHP | £13.10 |
| 2 | Lakeside | £12.75 |
| 3 | Keadby-2 Main | £12.58 |
| 4 | Cottam Development Centre | £12.33 |
| 5 | Ocker Hill | £12.16 |
| 6 | West Burton B 3 | £11.43 |
| 7 | Marchwood | £11.13 |