What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 19 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Limejump Energy #04 | £11.30 |
| 2 | Carnegie Road 1 | £8.80 |
| 3 | Native River | £7.41 |
| 4 | Carrington Ltd - 2 | £6.84 |
| 5 | EDFE Aggregate N Scot 1 | £3.00 |
| 6 | Blackpool | £2.77 |
| 7 | Swangate | £2.00 |
| Region | £/MWh |
|---|---|
| Merseyside and North Wales | £8.8 |
| South Western | £7.4 |
| Yorkshire | £2.0 |