What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 1 accepted unit with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Marchwood | £3.38 |
| 2 | Keadby-2 Main | £3.33 |
| 3 | Buxton | £3.17 |
| 4 | Didcot B main 5 | £2.76 |
| 5 | Swangate | £2.74 |
| 6 | Native River | £1.83 |
| 7 | Drax | £0.94 |
| Region | £/MWh |
|---|---|
| North Western | £3.2 |
| Yorkshire | £2.7 |
| South Western | £1.8 |