What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 10 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Pillswood 1 | £4.10 |
| 2 | Pillswood 2 | £3.76 |
| 3 | Native River | £3.58 |
| Region | £/MWh |
|---|---|
| Yorkshire | £3.9 |
| South Western | £3.6 |