What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 27 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Lakeside | £2.60 |
| 2 | Octopus Energy #00 | £2.46 |
| 3 | Flexitricity #09 | £2.40 |
| 4 | Flexitricity X02N | £2.39 |
| 5 | Flexitricity #01 | £2.28 |
| 6 | Flexitricity #04 | £2.27 |
| 7 | Flexitricity #01 | £2.20 |
| Region | £/MWh |
|---|---|
| Midlands | £2.1 |
| Yorkshire | £2.0 |
| Merseyside and North Wales | £1.6 |