What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 27 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Cottam Development Centre | £14.63 |
| 2 | Unit 1 | £14.05 |
| 3 | Little Raith | £13.74 |
| 4 | Native River | £12.23 |
| 5 | ZENOBE BLACKHILLOCK #4 | £10.88 |
| 6 | Hawthorn Pit | £10.86 |
| 7 | Jamesfield 2 | £10.80 |
| Region | £/MWh |
|---|---|
| South Scotland | £13.7 |
| South Western | £12.2 |
| North Scotland | £10.9 |
| Northern | £10.9 |
| Eastern | £9.5 |
| Midlands | £9.1 |