What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 27 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Cottam Development Centre | £6.25 |
| 2 | Unit 1 | £5.97 |
| 3 | Jamesfield 1 | £5.18 |
| 4 | Broadditch | £5.14 |
| 5 | Carrington Ltd - 2 | £4.97 |
| 6 | SUNDON | £4.94 |
| Region | £/MWh |
|---|---|
| North Scotland | £5.2 |
| South Eastern | £5.1 |
| Eastern | £4.9 |