What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 42 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Keadby-2 Main | £24.00 |
| 2 | Rocksavage | £23.86 |
| 3 | Cottam Development Centre | £22.94 |
| 4 | Shoreham | £21.25 |
| 5 | Spalding | £20.99 |
| 6 | West Burton B 3 | £18.13 |
| 7 | Carrington Ltd - 2 | £18.11 |
| Region | £/MWh |
|---|---|
| Southern | £18.0 |