What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 40 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Grain | £12.02 |
| 2 | Cottam Development Centre | £12.02 |
| 3 | Keadby-2 Main | £11.11 |
| 4 | Marchwood | £11.00 |
| 5 | Didcot B main 5 | £10.36 |
| 6 | Tye Lane | £10.23 |
| 7 | Damhead Creek | £9.67 |
| Region | £/MWh |
|---|---|
| Eastern | £10.2 |
| South Western | £9.6 |