What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 11 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Hunningley Stairfoot | £6.21 |
| 2 | F & S Energy #02 | £6.20 |
| 3 | Native River | £5.99 |
| Region | £/MWh |
|---|---|
| Yorkshire | £6.2 |
| South Western | £6.0 |